| 压实度(灌砂法) (%) | CMV*系数 | 校验y = −115.709 + 1.884*x | 预测x = 72.804 + 0.31873*y | ||
目标压实值CMV | 与真实值相差 | 压实度预测值 | 与真实值相差 | |||
剔除北道二遍灌砂93.3 | 88.7 | 49.7 | 51.4 | 1.7 | 88.645 | −0.055 |
88.2 | 47.0 | 50.46 | 3.46 | 87.78 | −0.42 | |
88.7 | 54.4 | 51.4 | −3 | 90.143 | 1.443 | |
90.5 | 54.0 | 54.793 | 0.793 | 90.012 | −0.488 | |
90.0 | 54.6 | 53.851 | −0.749 | 90.21 | 0.21 | |
89.6 | 55.1 | 53.1 | −2 | 90.367 | 0.767 | |
91.4 | 52.1 | 56.5 | 4.4 | 89.410 | −1.99 | |
92.5 | 57.2 | 58.6 | 1.4 | 91.035 | −1.465 | |
剔除南道二遍灌砂91.4 | 88.7 | 49.7 | 51.4 | 1.7 | 88.645 | −0.055 |
88.2 | 47.0 | 50.45 | 3.45 | 87.784 | −0.416 | |
88.7 | 54.4 | 51.4 | −3 | 90.143 | 1.443 | |
90.5 | 54.0 | 54.793 | 0.793 | 90.015 | −0.485 | |
90.0 | 54.6 | 53.851 | −0.749 | 90.207 | 0.207 | |
89.6 | 55.1 | 53.1 | −2 | 90.366 | 0.766 | |
92.5 | 57.2 | 58.56 | 1.36 | 93.518 | 1.018 |