工况

Case

设计载荷条件

Design Loading Condition

静载荷(自重)(%)

Dead Load (%)

钩载荷(%)

Hook Load (%)

转盘载荷(%)

Rotary Load (%)

立根载荷(%)

Setback Load (%)

环境载荷

Environment Loads

1a

操作

Operation

100

100

0

100

100% 操作环境

100% operation environment

2

预期

Expected

100

TE

100

0

100%可预期的暴风雨

100% expected storm environment

3a

不可预期

Unexpected

100

TE

100

100

100%不可预期暴风雨

100% unexpected storm environment

4

起升

Erection

100

适用时

As applicable

适用时

As applicable

0

100% erection environment