子模块

真实值

数据类型

MLR

ANN

SVM

GASVM

PSOSVM

换流变系统 建筑费

29,180,973

R

26,190,930

30,178,110

29,954,000

29,720,000

28,255,000

P

33,254,532

25,542,473

32,168,000

32,109,000

34,110,000

配电装置建筑费

38,540,222

R

38,647,503

39,418,180

35,857,000

35,964,000

50,301,000

P

29,391,897

67,077,103

45,444,000

35,964,000

46,973,000

主要生产建筑费用

158,085,575

R

158,520,724

154,335,099

167,780,000

153,540,000

153,830,000

P

206,008,382

163,549,927

174,280,000

153,540,000

153,580,000

辅助生产建筑费用

107,162,910

R

87,979,141

103,555,397

106,160,000

106,130,000

16,380,000

P

170,550,478

159,213,321

120,690,000

106,200,000

128,010,000

与站址有关的 单项工程

70,953,730

R

63,626,785

67,714,868

68,348,000

73,985,000

73,978,000

P

136,828,672

86,494,506

75,376,000

73,985,000

73,985,000

阀厅设备安装费

5,903,206

R

5,903,079

6,225,802

6,537,100

6,608,800

6,551,600

P

3,184,765

5,193,556

6,593,900

6,658,600

6,551,600

换流变系统安装费

12,544,653

R

12,542,707

11,507,900

11,634,000

11,772,000

11391000

P

10,874,284

12,181,846

11,826,000

11,548,000

11390000

配电装置安装费

34,530,675

R

34,528,147

32,044,319

20,241,000

28,459,000

26513000

P

−1,779,614

30,704,902

23,913,000

27,938,000

25513000

其他主要生产工程 安装费

116,451,318

R

113,789,265

113,096,770

86,560,000

83,810,000

104120000

P

119,367,730

119,845,526

108,930,000

107,210,000

104120000

阀厅设备费

879,881,287

R

873,313,017

887,819,416

859,890,000

795,120,000

835220000

P

1,121,888,374

795,511,422

867,870,000

833,490,000

835220000

换流变系统设备费

1,546,917,328

R

1,529,755,924

1,563,355,008

1,435,700,000

1,426,700,000

1443500000

P

1,540,916,154

1,658,286,432

1,495,000,000

1,526,000,000

1489500000

配电装置设备费

1,044,343,490

R

1,044,400,542

954,962,157

1,036,600,000

1,035,100,000

1130900000

P

−746,938,938

945,282,687

1,201,400,000

1,200,200,000

1192400000

其他主要生产工程 设备费

211,898,034

R

211,880,338

199,943,633

197,240,000

197,310,000

202330000

P

233,768,139

212,018,940

197,240,000

197,310,000

211910000