路面结构 | 结构层 | 厚度(cm) | 每层单价 | 总造价(元/m2) |
结构1 | SMA-13 | 5 | 41.569 | 395.95 |
SUP-19 | 7.5 | 68.346 | ||
SUP-25 | 21 | 155.096 | ||
LSM-25 | 9 | 60.486 | ||
Fatigue-13 | 7.5 | 70.450 | ||
结构2 | SMA-13 | 5 | 41.569 | 307.35 |
SUP-19 | 7.5 | 68.346 | ||
SUP-25 | 9 | 66.502 | ||
LSM-25 | 9 | 60.483 | ||
Fatigue-13 | 7.5 | 70.45 | ||
结构3 | SMA-13 | 5 | 41.569 | 324.69 |
SUP-19 | 7.5 | 68.346 | ||
SUP-25 | 9 | 66.502 | ||
LSM-25 | 9 | 60.486 | ||
Fatigue-13 | 7.5 | 87.790 | ||
结构4 | SMA-13 | 4 | 33.26 | 289.84 |
SUP-19 | 6 | 54.68 | ||
SUP-25 | 8 | 59.004 | ||
LSM-25 | 15 | 100.862 | ||
二灰碎石 | 20 | 27.09 | ||
二灰土 | 20 | 14.946 | ||
结构5 | SMA-13 | 4 | 33.26 | 185.18 |
AC-20 | 5 | 45.57 | ||
AC-25 | 6 | 44.33 | ||
二灰碎石 | 36 | 48.76 | ||
二灰土 | 20 | 14.946 |