各方案施工阶段拉索最小应力(MPa) | |||||||
拉索 编号 | J1 | J2 | J3 | J4 | J5 | J6 | J7 |
S9 | 200.90 | 200.80 | 200.60 | 200.50 | 199.2 | 186.90 | 181.10 |
S8 | 193.90 | 195.15 | 193.65 | 193.65 | 189.7 | 170.45 | 159.45 |
S7 | 194.25 | 195.45 | 195.45 | 194.20 | 188.3 | 161.80 | 144.75 |
S6 | 201.45 | 202.45 | 202.45 | 202.45 | 193.1 | 159.70 | 136.20 |
S5 | 214.35 | 215.15 | 215.10 | 215.10 | 215.15 | 162.45 | 132.55 |
S4 | 231.70 | 232.20 | 232.20 | 232.20 | 232.2 | 232.40 | 132.30 |
S3 | 104.15 | 104.55 | 104.50 | 104.50 | 104.55 | 104.70 | 104.90 |
S2 | 116.45 | 116.60 | 116.60 | 116.60 | 116.65 | 116.65 | 116.75 |
S1 | 123.75 | 123.75 | 123.75 | 123.75 | 123.8 | 123.80 | 123.80 |
L1 | 33.73 | 37.98 | 51.71 | 71.78 | 98.27 | 130.90 | 168.90 |
R1 | 33.73 | 37.98 | 51.71 | 71.78 | 98.27 | 130.90 | 168.90 |