任务编号 | 紧前任务编号 | 关键资源占用量 | 自制成本/万元 | 自制周期/天 | 外协成本/万元 | 外协周期/天 | ||
R1 | R2 | R3 | ||||||
|
| 3 | - | - | 1263.79 | 13 | (1400,1800,2000) | (11,9,6) |
|
| - | 4 | - | 113.36 | 5 | (140,200,180) | (4,2,3) |
|
| - | - | 5 | 1006.56 | 8 | (1100,1300,1500) | (5,4,3) |
|
| - | - | 3 | 604 | 6 | (900,700,860) | (2,4,3) |
|
| - | 3 | - | 230.4 | 4 | (300,400,450) | (4,3,2) |
|
| 4 | - | - | 841.4 | 4 | (888.7,943.5,1100) | (5,4,3) |
|
| 3 | - | - | 67.5 | 4 | (100,130,200) | (3,2,1) |
|
| - | - | 3 | 460.1 | 6 | (500.1,600,700) | (5,4,3) |
|
| - | 4 | - | 602.9 | 6 | (650,700,800) | (5,4,3) |
|
| 2 | - | - | 138.9 | 4 | (200,300,250) | (2,1,3) |
|
| - | 3 | - | 292.8 | 4 | (350,400,500) | (3,2,1) |
|
| - | 4 | - | 500 | 4 | (600,800,1000) | (3,2,1) |
|
| - |
| 3 | 380 | 7 | (450,500,600) | (6,5,3) |