| 订单A交付日期 | 总成本 | 延期交付成本 | 运输成本 | 存储成本 | 各订单生产结束时间 | |||||
| A | B | C | D | E | F | |||||
| 20 | 3,694,500 | 1,293,000 | 60,705 | 17,131 | 51.3 | 52.4 | 43.3 | 49.0 | 64.7 | 65.0 |
| 25 | 3,519,500 | 1,118,000 | 60,705 | 17,131 | 51.3 | 52.4 | 43.3 | 49.0 | 64.7 | 65.0 |
| 30 | 3,299,100 | 903,460 | 57,305 | 14,600 | 44.5 | 46.7 | 30.8 | 49.0 | 49.0 | 70.7 |
| 35 | 3,124,100 | 728,460 | 57,305 | 14,600 | 44.5 | 46.7 | 30.8 | 49.0 | 49.0 | 70.7 |
| 40 | 2,949,100 | 553,460 | 57,305 | 14,600 | 44.5 | 46.7 | 30.8 | 49.0 | 49.0 | 70.7 |
| 45 | 2,775,500 | 379,860 | 57,305 | 14,600 | 44.5 | 46.7 | 30.8 | 49.0 | 49.0 | 70.7 |
| 50 | 2,644,500 | 242,960 | 60,705 | 17,131 | 51.3 | 52.4 | 43.3 | 49.0 | 64.7 | 65.0 |
| 55 | 2,544,800 | 157,600 | 45,435 | 17,975 | 53.6 | 52.4 | 43.3 | 44.5 | 46.7 | 63.8 |
| 60 | 2,562,200 | 179,200 | 40,835 | 18,396 | 54.7 | 52.4 | 28.8 | 45.6 | 42.2 | 65.0 |
| 65 | 2,544,800 | 157,600 | 45,435 | 17,975 | 53.6 | 52.4 | 43.3 | 44.5 | 46.7 | 63.8 |