延迟时间 | 0 | 3 | 6 | 9 | 12 | 24 | 72 | 168 | |
水泥浆撒布量/% | 0% | 11 | 8.8 | 8.2 | 5.3 | 4.4 | 4.7 | 5.2 | 3.6 |
0.5% | 11.9 | 10 | 11.3 | 9.3 | 7.9 | 7.8 | 6.9 | 7.8 | |
1.0% | 12.4 | 10.3 | 8.6 | 9.5 | 9.7 | 7.8 | 7.1 | 7.2 | |
1.5% | 11.7 | 11.2 | 10.8 | 9.6 | 8.2 | 9.6 | 8.8 | 10.2 | |
最大增长率/% | 21.8 | 27.3 | 37.8 | 81.1 | 120.5 | 95.9 | 69.5 | 183 |