X7施工前应急逃生管理不足 | 0.007 | 0.284 | 0.674 | −0.082 | −0.255 | 0.288 | 0.690 |
X8安全隐患排查治理不当 | −0.133 | 0.224 | 0.655 | 0.103 | −0.347 | −0.067 | 0.632 |
X9防护设备不达标 | 0.027 | 0.058 | 0.031 | 0.653 | 0.306 | −0.071 | 0.530 |
X10施工设备不达标 | −0.072 | −0.202 | 0.321 | 0.366 | 0.123 | −0.189 | 0.334 |
X11设计方案不合理 | 0.241 | 0.513 | −0.253 | 0.445 | −0.154 | 0.165 | 0.634 |
X12施工方擅自改变施工方案 | −0.042 | 0.780 | 0.048 | −0.082 | 0.238 | 0.098 | 0.685 |
X13工地管理人员应急处理不当 | 0.261 | 0.284 | 0.157 | −0.435 | 0.045 | −0.367 | 0.499 |
X14高空作业意外 | −0.067 | −0.078 | −0.126 | −0.074 | −0.053 | 0.782 | 0.646 |
X15用电意外 | −0.056 | 0.407 | −0.031 | −0.345 | 0.598 | 0.020 | 0.647 |