孔号 | 勘察规范最小要求 | 本文方法 | ||
孔底高程/m | 施工要求 | 增加孔深/m | 施工要求 | |
4-1 | 68.3 | 不满足 | 3.6 | 满足 |
4-2 | 69.56 | 不满足 | 4.86 | 满足 |
4-3 | 67.57 | 满足 | 2.87 | 不满足 |
4-6 | 69.8 | 不满足 | 5.1 | 满足 |
4-14 | 68.45 | 不满足 | 3.75 | 满足 |
4-15 | 65.25 | 不满足 | 0.55 | 不满足 |
4-16 | 68.41 | 不满足 | 3.71 | 满足 |
4-25 | 64.72 | 满足 | 0.02 | 不满足 |
4-27 | 68.22 | 不满足 | 3.52 | 满足 |
4-29 | 70.83 | 不满足 | 6.13 | 满足 |