变量 | 短期ECM参数估计 | ||
系数 | 标准误差 | T统计量值(P值) | |
COINTEQ | −0.423913*** | 0.059648 | −7.106913 (0.0000) |
| 1.393987*** | 0.142673 | 9.770526 (0.0000) |
| −0.856736*** | 0.236070 | −3.629164 (0.0027) |
| 0.739744*** | 0.158001 | 4.681886 (0.0004) |
| −0.525702*** | 0.104249 | −5.042758 (0.0002) |
| 0.198363 | 0.138302 | 1.434276 (0.1735) |
| 0.068904 | 0.130320 | 0.528732 (0.6053) |
| 0.626855*** | 0.122925 | 5.099504 (0.0002) |
| 1.383965 | 0.124191 | 1.231076 (0.2386) |
| −3.091607* | 1.510520 | −2.046717 (0.0599) |
| −1.452044 | 1.519359 | −0.955695 (0.3554) |
| −2.245774* | 1.230742 | −1.824731 (0.0895) |
| 0.826837*** | 0.203244 | 4.068203 (0.0012) |
| −0.277372 | 0.208368 | −1.331162 (0.2044) |
| −0.069372 | 0.196641 | −0.352783 (0.7295) |
| 0.542519*** | 0.171476 | −3.163826 (0.0069) |
R-squqred = 0.983724 Durbin-Watson stat = 2.180588 F-statistic (prob) = 54.40994 (0.000000) |