| 点位 | 现状 | 工程前 | 流速变化 | |
| 绝对值 | 变化率(%) | |||
| 1-1 | 1.28 | 0.99 | 0.30 | 23.1 |
| 1-2 | 1.43 | 1.27 | 0.16 | 11.1 |
| 2-1 | 1.11 | 1.27 | −0.17 | −15.2 |
| 2-2 | 1.43 | 1.48 | −0.05 | −3.5 |
| 3-1 | 1.09 | 1.40 | −0.30 | −27.7 |
| 3-2 | 1.42 | 1.59 | −0.17 | −11.8 |
| 4-1 | 1.24 | 1.55 | −0.32 | −25.7 |
| 4-2 | 1.47 | 1.74 | −0.28 | −19.0 |
| 5-1 | 1.10 | 1.14 | −0.04 | −4.0 |
| 5-2 | 1.51 | 1.60 | −0.09 | −5.9 |
| 6-1 | 1.01 | 0.42 | 0.60 | 58.8 |
| 6-2 | 1.55 | 1.49 | 0.05 | 3.4 |
| 7-1 | 1.32 | 1.48 | −0.16 | −12.1 |
| 7-2 | 1.58 | 1.67 | −0.10 | −6.1 |