| 支路 | 状态估计前(A相) (单位:A) | 状态估计后(A相) (单位:A) | I偏差(状态估计后 − 状态估计前) |
| 1 | 97 | 95.372166581 | −1.627833419 |
| 2 | 36.6 | 36.461471686 | −0.138528314 |
| 3 | 58.6 | 58.62555034049 | 0.0255503405 |
| 4 | 7.6 | 7.6147552007 | 0.0147552007 |
| 5 | 51.5 | 51.51552063359 | 0.0155206336 |
| 6 | 42.4 | 42.42744645629 | 0.0274464563 |
| 7 | 8.3 | 8.2863172886 | −0.0136827114 |