市场状态 | 发电商1 | 发电商2 | 发电商3 | 现货电价的期望值/$/(MW∙h) | 期权敲定价/$/(MW∙h) | |||||||
发电量/(MW∙h) | 合约量/(MW∙h) | 收益 /$ | 发电量/(MW∙h) | 合约量/(MW∙h) | 收益 /$ | 发电量/(MW∙h) | 合约量/(MW∙h) | 收益 /$ | ||||
期权 | Cournot | 38.33 | 0 | 1021.0 | 36.25 | 0 | 945.88 | 34.38 | 0 | 880.42 | 43.35 |
|
远期合同 | 43.90 | 23.02 | 814.10 | 40.75 | 21.66 | 736.60 | 37.99 | 20.44 | 671.62 | 36.23 |
| |
| 45.77 | 46.57 | 730.59 | 42.17 | 43.57 | 655.24 | 39.04 | 40.83 | 592.90 | 33.97 | 30 | |
| 46.52 | 69.47 | 697.51 | 42.69 | 64.69 | 623.17 | 39.38 | 60.35 | 562.12 | 33.64 | 33.64 | |
| 46.79 | 82.87 | 685.61 | 42.87 | 77.02 | 611.67 | 39.49 | 71.73 | 551.12 | 32.84 | 35 |