| 模型 | 试验因素 | 响应值 | |||||
| 梁拱刚度比 | 吊杆间距 | 无索区长度 | 矢跨比 | R1 | R2 | R3 | |
| 1 | 26.1/1 | 4 m | 29 m | 1/5 | −46.95 | −34.26 | −6.23 |
| 2 | 26.1/1 | 8 m | 45 m | 1/6 | −48.21 | −25.11 | −9.30 |
| 3 | 26.1/1 | 16 m | 61 m | 1/7 | −44.61 | −43.68 | −9.78 |
| 4 | 58.1/1 | 4 m | 45 m | 1/7 | −68.71 | −59.90 | −7.94 |
| 5 | 58.1/1 | 8 m | 61 m | 1/5 | −65.29 | −68.44 | −7.82 |
| 6 | 58.1/1 | 16 m | 29 m | 1/6 | −64.91 | −77.63 | −6.51 |
| 7 | 92.1/1 | 4 m | 61 m | 1/6 | −77.08 | −73.55 | −1.93 |
| 8 | 92.1/1 | 8 m | 29 m | 1/7 | −74.81 | −81.72 | −1.33 |
| 9 | 92.1/1 | 16 m | 45 m | 1/5 | −57.77 | −80.61 | −5.48 |
| 10 | 26.1/1 | 4 m | 45 m | 1/7 | −75.45 | −38.06 | −4.02 |
| 11 | 26.1/1 | 8 m | 61 m | 1/5 | −44.30 | −32.14 | −11.40 |
| 12 | 26.1/1 | 16 m | 29 m | 1/6 | −68.77 | −65.36 | −3.30 |
| 13 | 58.1/1 | 4 m | 61 m | 1/6 | −69.86 | −57.67 | −7.92 |
| 14 | 58.1/1 | 8 m | 29 m | 1/7 | −67.45 | −67.55 | −7.32 |
| 15 | 58.1/1 | 16 m | 45 m | 1/5 | −62.46 | −81.85 | −6.63 |
| 16 | 92.1/1 | 4 m | 29 m | 1/5 | −63.58 | −68.39 | −6.95 |
| 17 | 92.1/1 | 8 m | 45 m | 1/6 | −67.65 | −65.98 | −7.38 |
| 18 | 92.1/1 | 16 m | 61 m | 1/7 | −64.97 | −77.85 | −6.50 |
| 19 | 26.1/1 | 4 m | 45 m | 1/6 | −74.45 | −37.53 | −5.41 |
| 20 | 26.1/1 | 8 m | 61 m | 1/7 | −47.42 | −29.53 | −10.80 |
| 21 | 58.1/1 | 8 m | 29 m | 1/6 | −67.68 | −65.93 | −7.39 |
| 22 | 58.1/1 | 16 m | 45 m | 1/7 | −65.03 | −77.68 | −6.49 |
| 23 | 92.1/1 | 8 m | 45 m | 1/5 | −60.25 | −70.14 | −6.49 |
| 24 | 92.1/1 | 16 m | 61 m | 1/6 | −59.60 | −77.86 | −5.39 |