开始日期 | 截止日期 | 施工内容 | RCX1 (上游) | RCX2 (下游) | 最大收敛值 (高程) | ||||
最大累计位移(高程) | 时段最大变形量(高程) | 时段最大速率(高程) | 最大累计位移(高程) | 时段最大变形量(高程) | 时段最大速率(高程) | ||||
2020-11-13 | 2021-1-20 | 岩锚梁浇筑及4层开挖 | 14.2 (858.5) | 14.2 (858.5) | 0.24 (858.5) | 6.1 (859.4) | 6.1 (859.4) | 0.08 (859.4) | 17.2 (858.5) |
2021-1-21 | 2021-4-20 | 4层开挖 | 17.7 (858.5) | 3.9 (858.9) | 0.04 (858.9) | 11.5 (858.9) | 8.4 (851.0) | 0.77 (851.0) | 27.6 (858.5) |
2021-4-21 | 2021-5-31 | 5层开挖 | 29.4 (858.0) | 22.2 (852.3) | 0.53 (852.3) | 33.6 (851.0) | 25.2 (851.0) | 0.60 (851.0) | 50.6 (851.8) |
2021-6-1 | 2021-7-18 | 6层开挖 | 40.7 (852.3) | 19.4 (846.0) | 0.42 (846.0) | 37.0 (851.0) | 3.9 (853.2) | 0.08 (853.2) | 68.8 (851.8) |
2021-7-19 | 2021-9-13 | 7层开挖 | 58.2 (852.3) | 24.9 (846.0) | 0.43 (846.0) | 42.6 (851.5) | 13.2 (851.5) | 0.23 (851.5) | 98.9 (851.8) |